Ready-Mix Truck Loads for a 20×30 Slab

Freight view of a 20 by 30 ft slab: yards per 10 yard truck and order weight.

Formula SSC-2026.1

Formula SSC-2026.1 · 4,000 PSI

Order volume

10.19 yd³

7.787 m³ placed+waste

Order weight

41,250 lb

18,711 kg

80 lb bags

459

11 pallets at 42 bags

60 lb bags

612

0.45 ft³ yield each

Rebar

840.00 ft

49 × 20 ft · 70 × 6 m · 617 lb

Ready-mix vs bags

$1,680.56

Truck $1,680.56 · 80 lb bags $3,098.25

Slab footprint and rebar gridLive scaled blueprint
30.00 ft20.00 ft#4 / 12 mm at 18 in OC · 5 in slab

Grid lines are equalized so the drawing stays readable. The order count uses on-center spacing with a bar at each end of the layout, then holds concrete cover in the field.

Bill of materials and shopping list
ItemNetWasteOrderUnit priceLine total
Ready-mix concrete9.26 yd³10%10.19 yd³ / 7.787 m³USD$1,680.56
Short-load feeFull load—2 truck @ 10 yd³USD$0.00
80 lb pre-mix bags416.7 bags10%459 bagsUSD$3,098.25
60 lb pre-mix bags555.6 bags10%612 bagsUSD$3,304.80
#4 rebar sticks, 20 ft49 sticks10%54 sticks / 70 × 6 mUSD$756.00
Rebar chairs294 crossings10%324 chairsUSD$90.72
Tie wire rolls294 ties10%2 rollsUSD$16.00

Ready-mix truck

$1,680.56

1.02 nominal 10 yd³ loads · 2 to order

80 lb bags

$3,098.25

60 lb alternative $3,304.80 · delivery weight 41,250 lb

Side-by-side thickness comparison at the same footprint
ThicknessOrder yd³Order m³80 lb bagsRebar ftReady-mix80 lb cost
4 in8.156.230367924$1,344.44$2,477.25
5 in10.197.787459924$1,680.56$3,098.25
6 in12.229.345550924$2,016.67$3,712.50
Show the deterministic formula

Slab ft³ = L × W × thickness ÷ 12. Thickened-edge extra = footing band × (footing depth − slab thickness), with corner squares counted once.

yd³ = ft³ ÷ 27. m³ = ft³ × 0.0283168. Weight uses 150 lb/ft³, then the header converts that pound total at 1 lb = 0.45359237 kg. 80 lb bags yield 0.6 ft³ and 60 lb bags yield 0.45 ft³. Currency changes the price labels only.

Bars across a span = floor(span ÷ spacing) + 1. Order sticks = that count, plus 10, 5, or 15 percent waste, cut from 20 ft and 6 m stock. Chairs = one per grid intersection.

Engineering notes

A nominal ready-mix truck on this sheet is 10 cubic yards. The 20 by 30 ft slab is 5 in thick with 10 percent waste, so you can read the decimal truck loads and the rounded trucks to book. Short loads under 4 yards suggest a fee you can edit. Ask the plant for the legal payload and the local axle limit before you assume every truck leaves full. The rebar truck is a separate weight on the same page.

Code reference

Planning capacity is 10 cubic yards per truck. Road limits and plant short-load rules control the actual dispatch. IRC R506 and ACI 318 still govern the slab itself.

Field questions

How full is one truck?
Divide order cubic yards by 10. A result of 1.3 means two trucks, and the second is not full.
Does waste change the truck count?
Yes. Waste is in the order yards. The placed volume is listed separately so you can see the allowance.
What should I tell the dispatcher?
Give the order yards, the PSI, the slump the finisher wants, and the short-load fee line if the pour is under 4 yards.