Hot Tub Pad Short-Load Concrete Delivery Fee

A very small pour where the short-load fee can exceed the concrete.

Formula SSC-2026.1

Formula SSC-2026.1 · 4,000 PSI

Order volume

0.70 yd³

0.535 m³ placed+waste

Order weight

2,835 lb

1,286 kg

80 lb bags

32

1 pallets at 42 bags

60 lb bags

42

0.45 ft³ yield each

Rebar

84.00 ft

14 × 20 ft · 14 × 6 m · 59 lb

Ready-mix vs bags

$216.00

Truck $240.50 · 80 lb bags $216.00

Slab footprint and rebar gridLive scaled blueprint
6.00 ft6.00 ft#4 / 12 mm at 12 in OC · 6 in slab

Grid lines are equalized so the drawing stays readable. The order count uses on-center spacing with a bar at each end of the layout, then holds concrete cover in the field.

Bill of materials and shopping list
ItemNetWasteOrderUnit priceLine total
Ready-mix concrete0.67 yd³5%0.70 yd³ / 0.535 m³USD$115.50
Short-load feeUnder 4 yd³—1 truck @ 10 yd³USD$125.00
80 lb pre-mix bags30.0 bags5%32 bagsUSD$216.00
60 lb pre-mix bags40.0 bags5%42 bagsUSD$226.80
#4 rebar sticks, 20 ft14 sticks5%15 sticks / 14 × 6 mUSD$210.00
Rebar chairs49 crossings5%52 chairsUSD$14.56
Tie wire rolls49 ties5%1 rollsUSD$8.00

Ready-mix truck

$240.50

0.07 nominal 10 yd³ loads · 1 to order

80 lb bags

$216.00

60 lb alternative $226.80 · delivery weight 2,835 lb

Side-by-side thickness comparison at the same footprint
ThicknessOrder yd³Order m³80 lb bagsRebar ftReady-mix80 lb cost
4 in0.470.3572188$202.00$141.75
6 in0.700.5353288$240.50$216.00
8 in0.930.7144288$279.00$283.50
Show the deterministic formula

Slab ft³ = L × W × thickness ÷ 12. Thickened-edge extra = footing band × (footing depth − slab thickness), with corner squares counted once.

yd³ = ft³ ÷ 27. m³ = ft³ × 0.0283168. Weight uses 150 lb/ft³, then the header converts that pound total at 1 lb = 0.45359237 kg. 80 lb bags yield 0.6 ft³ and 60 lb bags yield 0.45 ft³. Currency changes the price labels only.

Bars across a span = floor(span ÷ spacing) + 1. Order sticks = that count, plus 10, 5, or 15 percent waste, cut from 20 ft and 6 m stock. Chairs = one per grid intersection.

Engineering notes

The pad is 6 by 6 ft at 6 in, the same reinforced pad as the masonry preset, read here as a delivery problem. Order volume is well under 4 cubic yards, so the sheet suggests a 125 dollar short-load fee. Set the fee to your plant's number. Then compare that total with the 80 lb bag line. The rebar is #4 at 12 in and rides with the concrete or as a separate small bundle.

Code reference

IRC R506.1 sets a 3.5 in minimum for concrete slab-on-ground floors. Reinforcement cover and spacing follow ACI 318 practice and the local inspector. This quantity takeoff is not a soils or structural design.

Field questions

When does the short-load fee appear?
The suggestion turns on under 4 cubic yards and stays at zero at 4 yards and above. You can override it.
Is 125 dollars the real fee?
No. It is a placeholder so the comparison is not zero. Replace it with the plant quote.
Can I zero the fee if the plant is already on site?
Yes. Set the short-load price to zero and the ready-mix total drops to the material only.