12×40 Concrete Driveway Thickness and Cost

A 12 by 40 ft driveway apron priced at 5 in, with 4 in and 6 in beside it.

Formula SSC-2026.1

Formula SSC-2026.1 · 4,000 PSI

Order volume

8.15 yd³

6.230 m³ placed+waste

Order weight

33,000 lb

14,969 kg

80 lb bags

367

9 pallets at 42 bags

60 lb bags

489

0.45 ft³ yield each

Rebar

684.00 ft

45 × 20 ft · 54 × 6 m · 503 lb

Ready-mix vs bags

$1,344.44

Truck $1,344.44 · 80 lb bags $2,477.25

Slab footprint and rebar gridLive scaled blueprint
40.00 ft12.00 ft#4 / 12 mm at 18 in OC · 5 in slab

Grid lines are equalized so the drawing stays readable. The order count uses on-center spacing with a bar at each end of the layout, then holds concrete cover in the field.

Bill of materials and shopping list
ItemNetWasteOrderUnit priceLine total
Ready-mix concrete7.41 yd³10%8.15 yd³ / 6.230 m³USD$1,344.44
Short-load feeFull load—1 truck @ 10 yd³USD$0.00
80 lb pre-mix bags333.3 bags10%367 bagsUSD$2,477.25
60 lb pre-mix bags444.4 bags10%489 bagsUSD$2,640.60
#4 rebar sticks, 20 ft45 sticks10%50 sticks / 54 × 6 mUSD$700.00
Rebar chairs243 crossings10%268 chairsUSD$75.04
Tie wire rolls243 ties10%1 rollsUSD$8.00

Ready-mix truck

$1,344.44

0.81 nominal 10 yd³ loads · 1 to order

80 lb bags

$2,477.25

60 lb alternative $2,640.60 · delivery weight 33,000 lb

Side-by-side thickness comparison at the same footprint
ThicknessOrder yd³Order m³80 lb bagsRebar ftReady-mix80 lb cost
4 in6.524.984294752$1,075.56$1,984.50
5 in8.156.230367752$1,344.44$2,477.25
6 in9.787.476440752$1,613.33$2,970.00
Show the deterministic formula

Slab ft³ = L × W × thickness ÷ 12. Thickened-edge extra = footing band × (footing depth − slab thickness), with corner squares counted once.

yd³ = ft³ ÷ 27. m³ = ft³ × 0.0283168. Weight uses 150 lb/ft³, then the header converts that pound total at 1 lb = 0.45359237 kg. 80 lb bags yield 0.6 ft³ and 60 lb bags yield 0.45 ft³. Currency changes the price labels only.

Bars across a span = floor(span ÷ spacing) + 1. Order sticks = that count, plus 10, 5, or 15 percent waste, cut from 20 ft and 6 m stock. Chairs = one per grid intersection.

Engineering notes

Twelve by forty feet is 480 square feet. At 5 in that is about 7.41 cubic yards before waste and about 8.15 yards at 10 percent. The comparison table repeats 4, 5, and 6 in so the extra yard of thickness is visible before you call the plant. A driveway often sees wheel loads at the edges. The default mat is #4 at 18 in. Control joints, base rock, and slope are outside this volume takeoff.

Code reference

IRC R506.1 sets a 3.5 in minimum for concrete slab-on-ground floors. Reinforcement cover and spacing follow ACI 318 practice and the local inspector. This quantity takeoff is not a soils or structural design.

Field questions

How many yards is a 12x40 driveway at 5 inches?
Placed volume is 200 cubic feet, or 7.41 cubic yards. A 10 percent waste factor brings the order to about 8.15 cubic yards.
Is 4 inches cheaper by a full truck?
Move the thickness control and read the truck-load line. On this footprint, one inch of thickness is 40 cubic feet, about 1.48 yards before waste.
Should I add a thickened edge on a driveway?
Leave it off for a uniform driveway slab. Turn it on only where the plan shows a thickened apron or a curb edge, then set the width and depth.