16×16 Patio Slab at 4 Inches

A square 16 ft patio with a light #3 mat and low waste.

Formula SSC-2026.1

Formula SSC-2026.1 · 3,500 PSI

Order volume

3.32 yd³

2.537 m³ placed+waste

Order weight

13,440 lb

6,096 kg

80 lb bags

150

4 pallets at 42 bags

60 lb bags

200

0.45 ft³ yield each

Rebar

352.00 ft

22 × 20 ft · 22 × 6 m · 139 lb

Ready-mix vs bags

$672.56

Truck $672.56 · 80 lb bags $1,012.50

Slab footprint and rebar gridLive scaled blueprint
16.00 ft16.00 ft#3 / 10 mm at 18 in OC · 4 in slab

Grid lines are equalized so the drawing stays readable. The order count uses on-center spacing with a bar at each end of the layout, then holds concrete cover in the field.

Bill of materials and shopping list
ItemNetWasteOrderUnit priceLine total
Ready-mix concrete3.16 yd³5%3.32 yd³ / 2.537 m³USD$547.56
Short-load feeUnder 4 yd³—1 truck @ 10 yd³USD$125.00
80 lb pre-mix bags142.2 bags5%150 bagsUSD$1,012.50
60 lb pre-mix bags189.6 bags5%200 bagsUSD$1,080.00
#3 rebar sticks, 20 ft22 sticks5%24 sticks / 22 × 6 mUSD$204.00
Rebar chairs121 crossings5%128 chairsUSD$35.84
Tie wire rolls121 ties5%1 rollsUSD$8.00

Ready-mix truck

$672.56

0.33 nominal 10 yd³ loads · 1 to order

80 lb bags

$1,012.50

60 lb alternative $1,080.00 · delivery weight 13,440 lb

Side-by-side thickness comparison at the same footprint
ThicknessOrder yd³Order m³80 lb bagsRebar ftReady-mix80 lb cost
4 in3.322.537150370$672.56$1,012.50
5 in4.153.171187370$684.44$1,262.25
6 in4.983.806224370$821.33$1,512.00
Show the deterministic formula

Slab ft³ = L × W × thickness ÷ 12. Thickened-edge extra = footing band × (footing depth − slab thickness), with corner squares counted once.

yd³ = ft³ ÷ 27. m³ = ft³ × 0.0283168. Weight uses 150 lb/ft³, then the header converts that pound total at 1 lb = 0.45359237 kg. 80 lb bags yield 0.6 ft³ and 60 lb bags yield 0.45 ft³. Currency changes the price labels only.

Bars across a span = floor(span ÷ spacing) + 1. Order sticks = that count, plus 10, 5, or 15 percent waste, cut from 20 ft and 6 m stock. Chairs = one per grid intersection.

Engineering notes

A 16 ft square patio at 4 in is 3.16 cubic yards before waste. Five percent waste keeps the order near 3.32 yards, still in short-load territory for many plants. The mat is #3 at 18 in, which is lighter than a garage grid. If the patio is against the house, slope and the door threshold are field layout items this volume tool does not draw.

Code reference

IRC R506.1 sets a 3.5 in minimum for concrete slab-on-ground floors. Reinforcement cover and spacing follow ACI 318 practice and the local inspector. This quantity takeoff is not a soils or structural design.

Field questions

Is #3 bar enough for a patio?
The page counts #3 bars. Whether that mat is accepted depends on the slab use and the local code. Switch to #4 if the plan says so and the stick count updates.
Why is waste set to 5 percent?
A simple square with a careful screed often wastes less than a thickened shop slab. You can still select 10 or 15 percent.
Can I see 5 and 6 inch patios?
Yes. The comparison table repeats the same 16 by 16 ft footprint at 4, 5, and 6 in.