Skip to content
SiteSpecCalc

Length imperial. Weight lb. Currency USD. Weight uses 1 lb = 0.45359237 kg. Currency converts US-dollar planning prices and does not change volumes, counts, or geometry.

10 by 10 ft slab at 8 inches

Calculate the specifications for a 10 ft by 10 ft residential slab at 8 in thickness with #4 bars at 18 in spacing. Note: Soil design is excluded. Compliant with IRC R506.

Formula SSC-2026.1

Formula SSC-2026.1 · 4,000 PSI

Order volume

3.20 yd³

2.450 m³ placed+waste

Order weight

12,980 lb

5,888 kg

80 lb bags

145

4 pallets at 42 bags

60 lb bags

193

0.45 ft³ yield each

Rebar

220.00 ft

18 × 20 ft · 20 × 6 m · 162 lb

Ready-mix vs bags

$653.81

Truck $653.81 · 80 lb bags $978.75

Slab footprint and rebar gridLive scaled blueprint
10.00 ft10.00 ft#4 / 12 mm at 18 in OC · 8 in slab

Grid lines are equalized so the drawing stays readable. The order count uses on-center spacing with a bar at each end of the layout, then holds concrete cover in the field.

Bill of materials and shopping list
ItemNetWasteOrderUnit priceLine totalSource Spec Material / Tool
Ready-mix concrete2.91 yd³10%3.20 yd³ / 2.450 m³USD$528.81Source Spec Material / Tool
Short-load feeUnder 4 yd³—1 truck @ 10 yd³USD$125.00Source Spec Material / Tool
80 lb pre-mix bags131.1 bags10%145 bagsUSD$978.75Source Spec Material / Tool
60 lb pre-mix bags174.8 bags10%193 bagsUSD$1,042.20Source Spec Material / Tool
#4 rebar sticks, 20 ft18 sticks10%20 sticks / 20 × 6 mUSD$280.00Source Spec Material / Tool
Rebar chairs49 crossings10%54 chairsUSD$15.12Source Spec Material / Tool
Tie wire rolls49 ties10%1 rollsUSD$8.00Source Spec Material / Tool

Source links open a product search on the Amazon storefront for the selected currency. SiteSpecCalc may earn a commission. The link does not change the quantities above.

Ready-mix truck

$653.81

0.32 nominal 10 yd³ loads · 1 to order

80 lb bags

$978.75

60 lb alternative $1,042.20 · delivery weight 12,980 lb

Side-by-side thickness comparison at the same footprint
ThicknessOrder yd³Order m³80 lb bagsRebar ftReady-mix80 lb cost
4 in2.341.786106242$510.41$715.50
5 in2.551.952115242$546.26$776.25
6 in2.772.118125242$582.11$843.75
Show the deterministic formula

Slab ft³ = L × W × thickness ÷ 12. Thickened-edge extra = footing band × (footing depth − slab thickness), with corner squares counted once.

yd³ = ft³ ÷ 27. m³ = ft³ × 0.0283168. Weight uses 150 lb/ft³, then the header converts that pound total at 1 lb = 0.45359237 kg. 80 lb bags yield 0.6 ft³ and 60 lb bags yield 0.45 ft³. Currency changes the price labels only.

Bars across a span = floor(span ÷ spacing) + 1. Order sticks = that count, plus 10, 5, or 15 percent waste, cut from 20 ft and 6 m stock. Chairs = one per grid intersection.

Engineering notes

This calculator assists in determining the specifications for a residential slab measuring 10 ft by 10 ft with a thickness of 8 inches. The design incorporates #4 rebar spaced at 18 inches, ensuring structural integrity in compliance with IRC R506.

It is important to note that soil design considerations are excluded from this calculation. Always consult a licensed professional for comprehensive design and site-specific evaluations.

Code reference

IRC R506

Field questions

What is the purpose of using #4 bars in the slab?
The #4 bars provide reinforcement to the concrete slab, helping to control cracking and improve load-bearing capacity.
Why is soil design excluded from this calculation?
Soil design is site-specific and requires a geotechnical analysis to determine the appropriate foundation design based on soil conditions.
What does IRC R506 cover?
IRC R506 provides guidelines for the design and construction of concrete slabs on grade, including requirements for reinforcement, thickness, and other structural considerations.

Explore Related Engineering Calculations