Skip to content
SiteSpecCalc

Length imperial. Weight lb. Currency USD. Weight uses 1 lb = 0.45359237 kg. Currency converts US-dollar planning prices and does not change volumes, counts, or geometry.

10 by 14 ft slab at 4 inches

Calculate the requirements for a residential slab measuring 10 ft by 14 ft at 4 in thickness with #4 bars at 18 in spacing. Compliance with IRC R506 guidelines.

Formula SSC-2026.1

Formula SSC-2026.1 · 4,000 PSI

Order volume

1.90 yd³

1.454 m³ placed+waste

Order weight

7,700 lb

3,493 kg

80 lb bags

86

3 pallets at 42 bags

60 lb bags

115

0.45 ft³ yield each

Rebar

198.00 ft

17 × 20 ft · 17 × 6 m · 145 lb

Ready-mix vs bags

$438.70

Truck $438.70 · 80 lb bags $580.50

Slab footprint and rebar gridLive scaled blueprint
10.00 ft14.00 ft#4 / 12 mm at 18 in OC · 4 in slab

Grid lines are equalized so the drawing stays readable. The order count uses on-center spacing with a bar at each end of the layout, then holds concrete cover in the field.

Bill of materials and shopping list
ItemNetWasteOrderUnit priceLine totalSource Spec Material / Tool
Ready-mix concrete1.73 yd³10%1.90 yd³ / 1.454 m³USD$313.70Source Spec Material / Tool
Short-load feeUnder 4 yd³—1 truck @ 10 yd³USD$125.00Source Spec Material / Tool
80 lb pre-mix bags77.8 bags10%86 bagsUSD$580.50Source Spec Material / Tool
60 lb pre-mix bags103.7 bags10%115 bagsUSD$621.00Source Spec Material / Tool
#4 rebar sticks, 20 ft17 sticks10%19 sticks / 17 × 6 mUSD$266.00Source Spec Material / Tool
Rebar chairs70 crossings10%77 chairsUSD$21.56Source Spec Material / Tool
Tie wire rolls70 ties10%1 rollsUSD$8.00Source Spec Material / Tool

Source links open a product search on the Amazon storefront for the selected currency. SiteSpecCalc may earn a commission. The link does not change the quantities above.

Ready-mix truck

$438.70

0.19 nominal 10 yd³ loads · 1 to order

80 lb bags

$580.50

60 lb alternative $621.00 · delivery weight 7,700 lb

Side-by-side thickness comparison at the same footprint
ThicknessOrder yd³Order m³80 lb bagsRebar ftReady-mix80 lb cost
4 in1.901.45486218$438.70$580.50
5 in2.381.817107218$517.13$722.25
6 in2.852.180129218$595.56$870.75
Show the deterministic formula

Slab ft³ = L × W × thickness ÷ 12. Thickened-edge extra = footing band × (footing depth − slab thickness), with corner squares counted once.

yd³ = ft³ ÷ 27. m³ = ft³ × 0.0283168. Weight uses 150 lb/ft³, then the header converts that pound total at 1 lb = 0.45359237 kg. 80 lb bags yield 0.6 ft³ and 60 lb bags yield 0.45 ft³. Currency changes the price labels only.

Bars across a span = floor(span ÷ spacing) + 1. Order sticks = that count, plus 10, 5, or 15 percent waste, cut from 20 ft and 6 m stock. Chairs = one per grid intersection.

Engineering notes

This calculator assists in determining the specifications for a residential concrete slab measuring 10 ft by 14 ft with a thickness of 4 inches. The design includes #4 rebar spaced at 18 inches on center, ensuring structural integrity.

Please note that soil design considerations are excluded from this calculation. For accurate results, consult a professional engineer to assess soil conditions and ensure compliance with local codes.

Code reference

IRC R506 - Concrete Floors on Ground

Field questions

What is the purpose of using #4 bars in the slab?
The #4 bars provide reinforcement to the concrete slab, helping to control cracking and improve load-bearing capacity.
Why is soil design excluded from this calculation?
Soil design is excluded because it requires specific geotechnical analysis that varies by location. It's essential to evaluate soil conditions separately for accurate slab performance.
What does IRC R506 cover?
IRC R506 provides guidelines for the construction of concrete floors on ground, including thickness, reinforcement, and placement requirements.

Explore Related Engineering Calculations