Skip to content
SiteSpecCalc

Length imperial. Weight lb. Currency USD. Weight uses 1 lb = 0.45359237 kg. Currency converts US-dollar planning prices and does not change volumes, counts, or geometry.

10 by 8 ft slab at 4 inches

Calculate the requirements for a residential slab measuring 10 ft by 8 ft at 4 in thickness with #4 bars at 18 in spacing. Ensure compliance with IRC R506 standards.

Formula SSC-2026.1

Formula SSC-2026.1 · 4,000 PSI

Order volume

1.09 yd³

0.831 m³ placed+waste

Order weight

4,400 lb

1,996 kg

80 lb bags

49

2 pallets at 42 bags

60 lb bags

66

0.45 ft³ yield each

Rebar

116.00 ft

13 × 20 ft · 13 × 6 m · 85 lb

Ready-mix vs bags

$304.26

Truck $304.26 · 80 lb bags $330.75

Slab footprint and rebar gridLive scaled blueprint
10.00 ft8.00 ft#4 / 12 mm at 18 in OC · 4 in slab

Grid lines are equalized so the drawing stays readable. The order count uses on-center spacing with a bar at each end of the layout, then holds concrete cover in the field.

Bill of materials and shopping list
ItemNetWasteOrderUnit priceLine totalSource Spec Material / Tool
Ready-mix concrete0.99 yd³10%1.09 yd³ / 0.831 m³USD$179.26Source Spec Material / Tool
Short-load feeUnder 4 yd³—1 truck @ 10 yd³USD$125.00Source Spec Material / Tool
80 lb pre-mix bags44.4 bags10%49 bagsUSD$330.75Source Spec Material / Tool
60 lb pre-mix bags59.3 bags10%66 bagsUSD$356.40Source Spec Material / Tool
#4 rebar sticks, 20 ft13 sticks10%15 sticks / 13 × 6 mUSD$210.00Source Spec Material / Tool
Rebar chairs42 crossings10%47 chairsUSD$13.16Source Spec Material / Tool
Tie wire rolls42 ties10%1 rollsUSD$8.00Source Spec Material / Tool

Source links open a product search on the Amazon storefront for the selected currency. SiteSpecCalc may earn a commission. The link does not change the quantities above.

Ready-mix truck

$304.26

0.11 nominal 10 yd³ loads · 1 to order

80 lb bags

$330.75

60 lb alternative $356.40 · delivery weight 4,400 lb

Side-by-side thickness comparison at the same footprint
ThicknessOrder yd³Order m³80 lb bagsRebar ftReady-mix80 lb cost
4 in1.090.83149128$304.26$330.75
5 in1.361.03862128$349.07$418.50
6 in1.631.24674128$393.89$499.50
Show the deterministic formula

Slab ft³ = L × W × thickness ÷ 12. Thickened-edge extra = footing band × (footing depth − slab thickness), with corner squares counted once.

yd³ = ft³ ÷ 27. m³ = ft³ × 0.0283168. Weight uses 150 lb/ft³, then the header converts that pound total at 1 lb = 0.45359237 kg. 80 lb bags yield 0.6 ft³ and 60 lb bags yield 0.45 ft³. Currency changes the price labels only.

Bars across a span = floor(span ÷ spacing) + 1. Order sticks = that count, plus 10, 5, or 15 percent waste, cut from 20 ft and 6 m stock. Chairs = one per grid intersection.

Engineering notes

This calculator is designed to assist in the preliminary design of a residential concrete slab measuring 10 ft by 8 ft with a thickness of 4 inches. The slab incorporates #4 rebar spaced at 18 inches on center, which is essential for structural integrity.

Please note that soil design considerations are excluded from this calculation. For accurate soil bearing capacity and other site-specific factors, consulting a licensed engineer is recommended.

Code reference

IRC R506 - Concrete Floors on Ground

Field questions

What is the purpose of using rebar in a concrete slab?
Rebar provides tensile strength to the concrete, helping to prevent cracking and improve the overall durability of the slab.
Why is soil design excluded from this calculator?
Soil design is site-specific and requires a detailed analysis of soil properties, which is beyond the scope of this calculator. It's important to consult a licensed engineer for soil-related assessments.
What does IRC R506 cover?
IRC R506 provides guidelines for the design and construction of concrete floors on ground, including thickness, reinforcement, and placement requirements.

Explore Related Engineering Calculations