10 by 8 ft slab at 5 inches

Calculate the specifications for a residential slab measuring 10 ft by 8 ft at 5 in thickness with #4 bars at 18 in spacing. Ensure compliance with IRC R506 standards.

Formula SSC-2026.1

Formula SSC-2026.1 · 4,000 PSI

Order volume

1.36 yd³

1.038 m³ placed+waste

Order weight

5,500 lb

2,495 kg

80 lb bags

62

2 pallets at 42 bags

60 lb bags

82

0.45 ft³ yield each

Rebar

116.00 ft

13 × 20 ft · 13 × 6 m · 85 lb

Ready-mix vs bags

$349.07

Truck $349.07 · 80 lb bags $418.50

Slab footprint and rebar gridLive scaled blueprint
10.00 ft8.00 ft#4 / 12 mm at 18 in OC · 5 in slab

Grid lines are equalized so the drawing stays readable. The order count uses on-center spacing with a bar at each end of the layout, then holds concrete cover in the field.

Bill of materials and shopping list
ItemNetWasteOrderUnit priceLine totalSource Spec Material / Tool
Ready-mix concrete1.23 yd³10%1.36 yd³ / 1.038 m³USD$224.07Source Spec Material / Tool
Short-load feeUnder 4 yd³—1 truck @ 10 yd³USD$125.00Source Spec Material / Tool
80 lb pre-mix bags55.6 bags10%62 bagsUSD$418.50Source Spec Material / Tool
60 lb pre-mix bags74.1 bags10%82 bagsUSD$442.80Source Spec Material / Tool
#4 rebar sticks, 20 ft13 sticks10%15 sticks / 13 × 6 mUSD$210.00Source Spec Material / Tool
Rebar chairs42 crossings10%47 chairsUSD$13.16Source Spec Material / Tool
Tie wire rolls42 ties10%1 rollsUSD$8.00Source Spec Material / Tool

Source links open a product search on the Amazon storefront for the selected currency. SiteSpecCalc may earn a commission. The link does not change the quantities above.

Ready-mix truck

$349.07

0.14 nominal 10 yd³ loads · 1 to order

80 lb bags

$418.50

60 lb alternative $442.80 · delivery weight 5,500 lb

Side-by-side thickness comparison at the same footprint
ThicknessOrder yd³Order m³80 lb bagsRebar ftReady-mix80 lb cost
4 in1.090.83149128$304.26$330.75
5 in1.361.03862128$349.07$418.50
6 in1.631.24674128$393.89$499.50
Show the deterministic formula

Slab ft³ = L × W × thickness ÷ 12. Thickened-edge extra = footing band × (footing depth − slab thickness), with corner squares counted once.

yd³ = ft³ ÷ 27. m³ = ft³ × 0.0283168. Weight uses 150 lb/ft³, then the header converts that pound total at 1 lb = 0.45359237 kg. 80 lb bags yield 0.6 ft³ and 60 lb bags yield 0.45 ft³. Currency changes the price labels only.

Bars across a span = floor(span ÷ spacing) + 1. Order sticks = that count, plus 10, 5, or 15 percent waste, cut from 20 ft and 6 m stock. Chairs = one per grid intersection.

Engineering notes

This calculator is designed to assist in determining the specifications for a residential concrete slab. The slab dimensions are 10 ft by 8 ft with a thickness of 5 inches, reinforced with #4 bars spaced at 18 inches apart.

Please note that soil design considerations are excluded from this calculation. It is essential to consult a qualified engineer for soil analysis and other site-specific factors.

Code reference

IRC R506 - Concrete Floors on Ground

Field questions

What is the purpose of using #4 bars in the slab?
The #4 bars provide tensile strength to the concrete slab, helping to prevent cracking and improve structural integrity.
Why is soil design excluded from this calculation?
Soil design is excluded because it requires site-specific analysis and varies based on local conditions. It's important to consult a professional for soil evaluation.
What does IRC R506 cover?
IRC R506 provides guidelines for the design and construction of concrete floors on the ground, including reinforcement requirements and installation practices.
What are the dimensions of the slab being calculated?
The slab dimensions are 10 feet by 8 feet with a thickness of 5 inches.