12 by 10 ft slab at 4 inches
Calculate the requirements for a residential slab measuring 12 ft by 10 ft at 4 in thickness with #4 bars at 18 in spacing. Ensure compliance with IRC R506 standards.
Formula SSC-2026.1
Formula SSC-2026.1 · 4,000 PSI
Order volume
1.63 yd³
1.246 m³ placed+waste
Order weight
6,600 lb
2,994 kg
80 lb bags
74
2 pallets at 42 bags
60 lb bags
98
0.45 ft³ yield each
Rebar
174.00 ft
16 × 20 ft · 16 × 6 m · 128 lb
Ready-mix vs bags
$393.89
Truck $393.89 · 80 lb bags $499.50
Grid lines are equalized so the drawing stays readable. The order count uses on-center spacing with a bar at each end of the layout, then holds concrete cover in the field.
| Item | Net | Waste | Order | Unit price | Line total | Source Spec Material / Tool |
|---|---|---|---|---|---|---|
| Ready-mix concrete | 1.48 yd³ | 10% | 1.63 yd³ / 1.246 m³ | USD | $268.89 | Source Spec Material / Tool |
| Short-load fee | Under 4 yd³ | — | 1 truck @ 10 yd³ | USD | $125.00 | Source Spec Material / Tool |
| 80 lb pre-mix bags | 66.7 bags | 10% | 74 bags | USD | $499.50 | Source Spec Material / Tool |
| 60 lb pre-mix bags | 88.9 bags | 10% | 98 bags | USD | $529.20 | Source Spec Material / Tool |
| #4 rebar sticks, 20 ft | 16 sticks | 10% | 18 sticks / 16 × 6 m | USD | $252.00 | Source Spec Material / Tool |
| Rebar chairs | 63 crossings | 10% | 70 chairs | USD | $19.60 | Source Spec Material / Tool |
| Tie wire rolls | 63 ties | 10% | 1 rolls | USD | $8.00 | Source Spec Material / Tool |
Source links open a product search on the Amazon storefront for the selected currency. SiteSpecCalc may earn a commission. The link does not change the quantities above.
Ready-mix truck
$393.89
0.16 nominal 10 yd³ loads · 1 to order
80 lb bags
$499.50
60 lb alternative $529.20 · delivery weight 6,600 lb
| Thickness | Order yd³ | Order m³ | 80 lb bags | Rebar ft | Ready-mix | 80 lb cost |
|---|---|---|---|---|---|---|
| 4 in | 1.63 | 1.246 | 74 | 191 | $393.89 | $499.50 |
| 5 in | 2.04 | 1.557 | 92 | 191 | $461.11 | $621.00 |
| 6 in | 2.44 | 1.869 | 110 | 191 | $528.33 | $742.50 |
Show the deterministic formula
Slab ft³ = L × W × thickness ÷ 12. Thickened-edge extra = footing band × (footing depth − slab thickness), with corner squares counted once.
yd³ = ft³ ÷ 27. m³ = ft³ × 0.0283168. Weight uses 150 lb/ft³, then the header converts that pound total at 1 lb = 0.45359237 kg. 80 lb bags yield 0.6 ft³ and 60 lb bags yield 0.45 ft³. Currency changes the price labels only.
Bars across a span = floor(span ÷ spacing) + 1. Order sticks = that count, plus 10, 5, or 15 percent waste, cut from 20 ft and 6 m stock. Chairs = one per grid intersection.
Contractor sign-off
Project: 12 by 10 ft slab at 4 inches
Prepared by
Date
Verified by (PE / electrician / inspector)
License number
Signature
This sheet is an estimate for ordering and layout discussion. It is not a sealed design. Confirm the quantities with a licensed local professional and the authority having jurisdiction before you buy or build.
Engineering notes
This calculator helps you design a residential concrete slab measuring 12 ft by 10 ft with a thickness of 4 inches. Reinforcement is provided using #4 bars spaced at 18 inches on center. Please note that soil design considerations are excluded from this calculation.
Ensure to follow IRC R506 guidelines for proper installation and compliance.
Code reference
IRC R506
Field questions
- What is the purpose of using #4 bars in the slab?
- The #4 bars are used to provide tensile strength to the concrete slab, helping to prevent cracking and improve overall durability.
- Why is soil design excluded from this calculation?
- Soil design is excluded because it requires specific site analysis and conditions that vary widely; this calculator focuses solely on the concrete slab design.
- What are the dimensions of the slab being calculated?
- The slab dimensions are 12 feet by 10 feet with a thickness of 4 inches.
- What does IRC R506 cover?
- IRC R506 provides guidelines for the design and construction of concrete slabs on grade, ensuring structural integrity and safety.