14 by 10 ft slab at 6 inches

Calculate the requirements for a residential slab measuring 14 ft by 10 ft at 6 in thickness with #4 bars at 18 in spacing. Ensure compliance with IRC R506 standards.

Formula SSC-2026.1

Formula SSC-2026.1 · 4,000 PSI

Order volume

3.75 yd³

2.866 m³ placed+waste

Order weight

15,180 lb

6,886 kg

80 lb bags

169

5 pallets at 42 bags

60 lb bags

225

0.45 ft³ yield each

Rebar

294.00 ft

23 × 20 ft · 23 × 6 m · 216 lb

Ready-mix vs bags

$743.44

Truck $743.44 · 80 lb bags $1,140.75

Slab footprint and rebar gridLive scaled blueprint
14.00 ft10.00 ft#4 / 12 mm at 18 in OC · 6 in slab

Grid lines are equalized so the drawing stays readable. The order count uses on-center spacing with a bar at each end of the layout, then holds concrete cover in the field.

Bill of materials and shopping list
ItemNetWasteOrderUnit priceLine totalSource Spec Material / Tool
Ready-mix concrete3.41 yd³10%3.75 yd³ / 2.866 m³USD$618.44Source Spec Material / Tool
Short-load feeUnder 4 yd³—1 truck @ 10 yd³USD$125.00Source Spec Material / Tool
80 lb pre-mix bags153.3 bags10%169 bagsUSD$1,140.75Source Spec Material / Tool
60 lb pre-mix bags204.4 bags10%225 bagsUSD$1,215.00Source Spec Material / Tool
#4 rebar sticks, 20 ft23 sticks10%26 sticks / 23 × 6 mUSD$364.00Source Spec Material / Tool
Rebar chairs70 crossings10%77 chairsUSD$21.56Source Spec Material / Tool
Tie wire rolls70 ties10%1 rollsUSD$8.00Source Spec Material / Tool

Source links open a product search on the Amazon storefront for the selected currency. SiteSpecCalc may earn a commission. The link does not change the quantities above.

Ready-mix truck

$743.44

0.37 nominal 10 yd³ loads · 1 to order

80 lb bags

$1,140.75

60 lb alternative $1,215.00 · delivery weight 15,180 lb

Side-by-side thickness comparison at the same footprint
ThicknessOrder yd³Order m³80 lb bagsRebar ftReady-mix80 lb cost
4 in3.102.367140323$635.89$945.00
5 in3.422.616154323$689.67$1,039.50
6 in3.752.866169323$743.44$1,140.75
Show the deterministic formula

Slab ft³ = L × W × thickness ÷ 12. Thickened-edge extra = footing band × (footing depth − slab thickness), with corner squares counted once.

yd³ = ft³ ÷ 27. m³ = ft³ × 0.0283168. Weight uses 150 lb/ft³, then the header converts that pound total at 1 lb = 0.45359237 kg. 80 lb bags yield 0.6 ft³ and 60 lb bags yield 0.45 ft³. Currency changes the price labels only.

Bars across a span = floor(span ÷ spacing) + 1. Order sticks = that count, plus 10, 5, or 15 percent waste, cut from 20 ft and 6 m stock. Chairs = one per grid intersection.

Engineering notes

This calculator is designed to assist in the design of a residential concrete slab measuring 14 ft by 10 ft with a thickness of 6 inches. Reinforcement is provided using #4 bars spaced at 18 inches. Please note that soil design considerations are excluded from this calculation.

For compliance, refer to the International Residential Code (IRC) Section R506, which outlines the requirements for concrete slabs, including reinforcement and thickness specifications.

Code reference

IRC R506

Field questions

What is the purpose of using #4 bars in the slab?
Using #4 bars helps to reinforce the concrete slab, providing additional tensile strength and reducing the risk of cracking.
Why is soil design excluded from this calculation?
Soil design is excluded because it requires specific site analysis and testing, which is beyond the scope of this calculator.
What thickness is recommended for residential slabs?
The recommended thickness for residential slabs is typically 4 to 6 inches, depending on the load and usage.
How do I ensure my slab meets IRC R506 requirements?
To ensure compliance with IRC R506, follow the guidelines for slab thickness, reinforcement spacing, and proper curing methods as outlined in the code.