14 by 20 ft slab at 4 inches
Calculate the requirements for a residential slab measuring 14 ft by 20 ft at 4 in thickness with #4 bars at 18 in spacing. Ensure compliance with IRC R506 standards.
Formula SSC-2026.1
Formula SSC-2026.1 · 4,000 PSI
Order volume
3.80 yd³
2.907 m³ placed+waste
Order weight
15,400 lb
6,985 kg
80 lb bags
172
5 pallets at 42 bags
60 lb bags
229
0.45 ft³ yield each
Rebar
396.00 ft
24 × 20 ft · 34 × 6 m · 291 lb
Ready-mix vs bags
$752.41
Truck $752.41 · 80 lb bags $1,161.00
Grid lines are equalized so the drawing stays readable. The order count uses on-center spacing with a bar at each end of the layout, then holds concrete cover in the field.
| Item | Net | Waste | Order | Unit price | Line total | Source Spec Material / Tool |
|---|---|---|---|---|---|---|
| Ready-mix concrete | 3.46 yd³ | 10% | 3.80 yd³ / 2.907 m³ | USD | $627.41 | Source Spec Material / Tool |
| Short-load fee | Under 4 yd³ | — | 1 truck @ 10 yd³ | USD | $125.00 | Source Spec Material / Tool |
| 80 lb pre-mix bags | 155.6 bags | 10% | 172 bags | USD | $1,161.00 | Source Spec Material / Tool |
| 60 lb pre-mix bags | 207.4 bags | 10% | 229 bags | USD | $1,236.60 | Source Spec Material / Tool |
| #4 rebar sticks, 20 ft | 24 sticks | 10% | 27 sticks / 34 × 6 m | USD | $378.00 | Source Spec Material / Tool |
| Rebar chairs | 140 crossings | 10% | 154 chairs | USD | $43.12 | Source Spec Material / Tool |
| Tie wire rolls | 140 ties | 10% | 1 rolls | USD | $8.00 | Source Spec Material / Tool |
Source links open a product search on the Amazon storefront for the selected currency. SiteSpecCalc may earn a commission. The link does not change the quantities above.
Ready-mix truck
$752.41
0.38 nominal 10 yd³ loads · 1 to order
80 lb bags
$1,161.00
60 lb alternative $1,236.60 · delivery weight 15,400 lb
| Thickness | Order yd³ | Order m³ | 80 lb bags | Rebar ft | Ready-mix | 80 lb cost |
|---|---|---|---|---|---|---|
| 4 in | 3.80 | 2.907 | 172 | 436 | $752.41 | $1,161.00 |
| 5 in | 4.75 | 3.634 | 214 | 436 | $784.26 | $1,444.50 |
| 6 in | 5.70 | 4.361 | 257 | 436 | $941.11 | $1,734.75 |
Show the deterministic formula
Slab ft³ = L × W × thickness ÷ 12. Thickened-edge extra = footing band × (footing depth − slab thickness), with corner squares counted once.
yd³ = ft³ ÷ 27. m³ = ft³ × 0.0283168. Weight uses 150 lb/ft³, then the header converts that pound total at 1 lb = 0.45359237 kg. 80 lb bags yield 0.6 ft³ and 60 lb bags yield 0.45 ft³. Currency changes the price labels only.
Bars across a span = floor(span ÷ spacing) + 1. Order sticks = that count, plus 10, 5, or 15 percent waste, cut from 20 ft and 6 m stock. Chairs = one per grid intersection.
Contractor sign-off
Project: 14 by 20 ft slab at 4 inches
Prepared by
Date
Verified by (PE / electrician / inspector)
License number
Signature
This sheet is an estimate for ordering and layout discussion. It is not a sealed design. Confirm the quantities with a licensed local professional and the authority having jurisdiction before you buy or build.
Engineering notes
This calculator assists in determining the specifications for a residential slab measuring 14 ft by 20 ft with a thickness of 4 inches. The design incorporates #4 rebar spaced at 18 inches on center, which is compliant with IRC R506 guidelines for residential concrete slabs.
Please note that soil design considerations are excluded from this calculation. It is essential to evaluate the underlying soil conditions to ensure proper support for the slab.
Code reference
IRC R506
Field questions
- What is the significance of IRC R506?
- IRC R506 provides guidelines for the design and construction of concrete slabs in residential buildings, ensuring safety and structural integrity.
- Why is soil design excluded from this calculation?
- Soil design is excluded because it requires specific geotechnical analysis that varies by location and is crucial for determining the load-bearing capacity of the soil.
- What does #4 rebar mean?
- #4 rebar refers to reinforcing bars that are 1/2 inch in diameter, commonly used in concrete construction to enhance tensile strength.
- How do I ensure my slab meets local building codes?
- Consult with a licensed engineer or local building authority to verify that your slab design complies with all applicable codes and regulations.
Explore Related Engineering Calculations
- 14 by 12 ft slab at 8 inches
- 14 by 14 ft slab at 4 inches
- 8 by 8 ft slab at 8 inches
- 8 by 10 ft slab at 4 inches
- 14 by 14 ft slab at 5 inches
- 14 by 14 ft slab at 6 inches
- 50 Amp EV Charger Wire Size at 50, 75, and 100 Feet
- Deck Stair Stringer Calculator, 36 to 96 Inch Rise
- 6/12 Roof Pitch, Rafter Length, and Shingle Bundles
- 20 ft dry, US 48×40 pallets: Pallet Count, CBM, and Payload