14 by 24 ft slab at 6 inches
Calculate the specifications for a 14 ft by 24 ft residential slab at 6 inches thick with #4 bars at 18 inches. Ensure compliance with IRC R506 standards.
Formula SSC-2026.1
Formula SSC-2026.1 · 4,000 PSI
Order volume
8.31 yd³
6.354 m³ placed+waste
Order weight
33,660 lb
15,268 kg
80 lb bags
374
9 pallets at 42 bags
60 lb bags
499
0.45 ft³ yield each
Rebar
630.00 ft
45 × 20 ft · 45 × 6 m · 463 lb
Ready-mix vs bags
$1,371.33
Truck $1,371.33 · 80 lb bags $2,524.50
Grid lines are equalized so the drawing stays readable. The order count uses on-center spacing with a bar at each end of the layout, then holds concrete cover in the field.
| Item | Net | Waste | Order | Unit price | Line total | Source Spec Material / Tool |
|---|---|---|---|---|---|---|
| Ready-mix concrete | 7.56 yd³ | 10% | 8.31 yd³ / 6.354 m³ | USD | $1,371.33 | Source Spec Material / Tool |
| Short-load fee | Full load | — | 1 truck @ 10 yd³ | USD | $0.00 | Source Spec Material / Tool |
| 80 lb pre-mix bags | 340.0 bags | 10% | 374 bags | USD | $2,524.50 | Source Spec Material / Tool |
| 60 lb pre-mix bags | 453.3 bags | 10% | 499 bags | USD | $2,694.60 | Source Spec Material / Tool |
| #4 rebar sticks, 20 ft | 45 sticks | 10% | 50 sticks / 45 × 6 m | USD | $700.00 | Source Spec Material / Tool |
| Rebar chairs | 170 crossings | 10% | 187 chairs | USD | $52.36 | Source Spec Material / Tool |
| Tie wire rolls | 170 ties | 10% | 1 rolls | USD | $8.00 | Source Spec Material / Tool |
Source links open a product search on the Amazon storefront for the selected currency. SiteSpecCalc may earn a commission. The link does not change the quantities above.
Ready-mix truck
$1,371.33
0.83 nominal 10 yd³ loads · 1 to order
80 lb bags
$2,524.50
60 lb alternative $2,694.60 · delivery weight 33,660 lb
| Thickness | Order yd³ | Order m³ | 80 lb bags | Rebar ft | Ready-mix | 80 lb cost |
|---|---|---|---|---|---|---|
| 4 in | 6.52 | 4.984 | 294 | 693 | $1,075.56 | $1,984.50 |
| 5 in | 7.41 | 5.669 | 334 | 693 | $1,223.44 | $2,254.50 |
| 6 in | 8.31 | 6.354 | 374 | 693 | $1,371.33 | $2,524.50 |
Show the deterministic formula
Slab ft³ = L × W × thickness ÷ 12. Thickened-edge extra = footing band × (footing depth − slab thickness), with corner squares counted once.
yd³ = ft³ ÷ 27. m³ = ft³ × 0.0283168. Weight uses 150 lb/ft³, then the header converts that pound total at 1 lb = 0.45359237 kg. 80 lb bags yield 0.6 ft³ and 60 lb bags yield 0.45 ft³. Currency changes the price labels only.
Bars across a span = floor(span ÷ spacing) + 1. Order sticks = that count, plus 10, 5, or 15 percent waste, cut from 20 ft and 6 m stock. Chairs = one per grid intersection.
Contractor sign-off
Project: 14 by 24 ft slab at 6 inches
Prepared by
Date
Verified by (PE / electrician / inspector)
License number
Signature
This sheet is an estimate for ordering and layout discussion. It is not a sealed design. Confirm the quantities with a licensed local professional and the authority having jurisdiction before you buy or build.
Engineering notes
This calculator is designed for a residential slab measuring 14 ft by 24 ft with a thickness of 6 inches. Reinforcement is provided using #4 bars spaced at 18 inches apart. Please note that soil design considerations are excluded from this calculation.
For compliance, refer to the International Residential Code (IRC) R506, which outlines the requirements for concrete slabs in residential construction.
Code reference
IRC R506
Field questions
- What is the purpose of using #4 bars in the slab?
- The #4 bars provide reinforcement to the concrete slab, helping to control cracking and improve structural integrity.
- Why is soil design excluded from this calculation?
- Soil design is specific to site conditions and requires a geotechnical analysis, which is not included in this calculator.
- What does IRC R506 cover?
- IRC R506 provides guidelines for the design and construction of concrete slabs, including thickness, reinforcement, and placement.