8 by 14 ft slab at 5 inches

Calculate the specifications for an 8 ft by 14 ft residential slab with #4 bars at 18 in spacing. Ensure compliance with IRC R506 standards. Soil design is excluded.

Formula SSC-2026.1

Formula SSC-2026.1 · 4,000 PSI

Order volume

1.90 yd³

1.454 m³ placed+waste

Order weight

7,700 lb

3,493 kg

80 lb bags

86

3 pallets at 42 bags

60 lb bags

115

0.45 ft³ yield each

Rebar

164.00 ft

16 × 20 ft · 16 × 6 m · 121 lb

Ready-mix vs bags

$438.70

Truck $438.70 · 80 lb bags $580.50

Slab footprint and rebar gridLive scaled blueprint
8.00 ft14.00 ft#4 / 12 mm at 18 in OC · 5 in slab

Grid lines are equalized so the drawing stays readable. The order count uses on-center spacing with a bar at each end of the layout, then holds concrete cover in the field.

Bill of materials and shopping list
ItemNetWasteOrderUnit priceLine totalSource Spec Material / Tool
Ready-mix concrete1.73 yd³10%1.90 yd³ / 1.454 m³USD$313.70Source Spec Material / Tool
Short-load feeUnder 4 yd³—1 truck @ 10 yd³USD$125.00Source Spec Material / Tool
80 lb pre-mix bags77.8 bags10%86 bagsUSD$580.50Source Spec Material / Tool
60 lb pre-mix bags103.7 bags10%115 bagsUSD$621.00Source Spec Material / Tool
#4 rebar sticks, 20 ft16 sticks10%18 sticks / 16 × 6 mUSD$252.00Source Spec Material / Tool
Rebar chairs60 crossings10%66 chairsUSD$18.48Source Spec Material / Tool
Tie wire rolls60 ties10%1 rollsUSD$8.00Source Spec Material / Tool

Source links open a product search on the Amazon storefront for the selected currency. SiteSpecCalc may earn a commission. The link does not change the quantities above.

Ready-mix truck

$438.70

0.19 nominal 10 yd³ loads · 1 to order

80 lb bags

$580.50

60 lb alternative $621.00 · delivery weight 7,700 lb

Side-by-side thickness comparison at the same footprint
ThicknessOrder yd³Order m³80 lb bagsRebar ftReady-mix80 lb cost
4 in1.521.16369180$375.96$465.75
5 in1.901.45486180$438.70$580.50
6 in2.281.744103180$501.44$695.25
Show the deterministic formula

Slab ft³ = L × W × thickness ÷ 12. Thickened-edge extra = footing band × (footing depth − slab thickness), with corner squares counted once.

yd³ = ft³ ÷ 27. m³ = ft³ × 0.0283168. Weight uses 150 lb/ft³, then the header converts that pound total at 1 lb = 0.45359237 kg. 80 lb bags yield 0.6 ft³ and 60 lb bags yield 0.45 ft³. Currency changes the price labels only.

Bars across a span = floor(span ÷ spacing) + 1. Order sticks = that count, plus 10, 5, or 15 percent waste, cut from 20 ft and 6 m stock. Chairs = one per grid intersection.

Engineering notes

This calculator provides guidance for designing a residential slab measuring 8 ft by 14 ft with a thickness of 5 inches. Reinforcement is specified using #4 bars spaced at 18 inches on center.

It is important to note that soil design considerations are excluded from this calculation. Always consult a qualified engineer for site-specific soil analysis and compliance with local codes.

Code reference

IRC R506 - Concrete Floors on Ground

Field questions

What is the purpose of using #4 bars in the slab?
The #4 bars provide tensile strength to the concrete slab, helping to resist cracking and improve overall structural integrity.
Why is soil design excluded from this calculation?
Soil design is site-specific and requires a geotechnical investigation. This calculator focuses solely on the concrete slab design as per IRC R506.
What thickness is recommended for a residential slab?
A thickness of 5 inches is commonly recommended for residential slabs, but this may vary based on load requirements and local building codes.
How do I ensure compliance with IRC R506?
To ensure compliance, follow the guidelines outlined in IRC R506 for concrete floors on ground, including proper reinforcement, thickness, and curing practices.