8 by 14 ft slab at 6 inches

Calculate the specifications for an 8 ft by 14 ft residential slab with #4 bars at 18 in spacing. Ensure compliance with IRC R506 guidelines. Soil design is excluded.

Formula SSC-2026.1

Formula SSC-2026.1 · 4,000 PSI

Order volume

3.10 yd³

2.367 m³ placed+waste

Order weight

12,540 lb

5,688 kg

80 lb bags

140

4 pallets at 42 bags

60 lb bags

186

0.45 ft³ yield each

Rebar

252.00 ft

22 × 20 ft · 22 × 6 m · 185 lb

Ready-mix vs bags

$635.89

Truck $635.89 · 80 lb bags $945.00

Slab footprint and rebar gridLive scaled blueprint
8.00 ft14.00 ft#4 / 12 mm at 18 in OC · 6 in slab

Grid lines are equalized so the drawing stays readable. The order count uses on-center spacing with a bar at each end of the layout, then holds concrete cover in the field.

Bill of materials and shopping list
ItemNetWasteOrderUnit priceLine totalSource Spec Material / Tool
Ready-mix concrete2.81 yd³10%3.10 yd³ / 2.367 m³USD$510.89Source Spec Material / Tool
Short-load feeUnder 4 yd³—1 truck @ 10 yd³USD$125.00Source Spec Material / Tool
80 lb pre-mix bags126.7 bags10%140 bagsUSD$945.00Source Spec Material / Tool
60 lb pre-mix bags168.9 bags10%186 bagsUSD$1,004.40Source Spec Material / Tool
#4 rebar sticks, 20 ft22 sticks10%25 sticks / 22 × 6 mUSD$350.00Source Spec Material / Tool
Rebar chairs60 crossings10%66 chairsUSD$18.48Source Spec Material / Tool
Tie wire rolls60 ties10%1 rollsUSD$8.00Source Spec Material / Tool

Source links open a product search on the Amazon storefront for the selected currency. SiteSpecCalc may earn a commission. The link does not change the quantities above.

Ready-mix truck

$635.89

0.31 nominal 10 yd³ loads · 1 to order

80 lb bags

$945.00

60 lb alternative $1,004.40 · delivery weight 12,540 lb

Side-by-side thickness comparison at the same footprint
ThicknessOrder yd³Order m³80 lb bagsRebar ftReady-mix80 lb cost
4 in2.611.994118277$555.22$796.50
5 in2.852.180129277$595.56$870.75
6 in3.102.367140277$635.89$945.00
Show the deterministic formula

Slab ft³ = L × W × thickness ÷ 12. Thickened-edge extra = footing band × (footing depth − slab thickness), with corner squares counted once.

yd³ = ft³ ÷ 27. m³ = ft³ × 0.0283168. Weight uses 150 lb/ft³, then the header converts that pound total at 1 lb = 0.45359237 kg. 80 lb bags yield 0.6 ft³ and 60 lb bags yield 0.45 ft³. Currency changes the price labels only.

Bars across a span = floor(span ÷ spacing) + 1. Order sticks = that count, plus 10, 5, or 15 percent waste, cut from 20 ft and 6 m stock. Chairs = one per grid intersection.

Engineering notes

This calculator provides guidance for designing a residential concrete slab measuring 8 ft by 14 ft with a thickness of 6 inches. The recommended reinforcement includes #4 bars spaced at 18 inches on center. Please note that soil design considerations are excluded from this calculation.

Ensure compliance with the International Residential Code (IRC) R506 for slab-on-ground construction to maintain structural integrity and safety.

Code reference

IRC R506

Field questions

What is the purpose of using #4 bars in the slab?
The #4 bars provide reinforcement to the concrete slab, helping to control cracking and improve load-bearing capacity.
Why is soil design excluded from this calculation?
Soil design is a separate consideration that involves evaluating the soil's bearing capacity and stability, which is not covered in this slab design calculator.
What thickness is recommended for residential slabs?
For this specific design, a thickness of 6 inches is recommended to ensure adequate strength and durability.
How do I ensure compliance with IRC R506?
Follow the guidelines outlined in IRC R506 for slab-on-ground construction, including proper reinforcement, thickness, and curing methods.