8 by 30 ft slab at 6 inches

Calculate the design for an 8 ft by 30 ft residential slab at 6 in thickness with #4 bars at 18 in spacing. Ensure compliance with IRC R506 standards.

Formula SSC-2026.1

Formula SSC-2026.1 · 4,000 PSI

Order volume

6.36 yd³

4.859 m³ placed+waste

Order weight

25,740 lb

11,675 kg

80 lb bags

286

7 pallets at 42 bags

60 lb bags

382

0.45 ft³ yield each

Rebar

500.00 ft

41 × 20 ft · 41 × 6 m · 367 lb

Ready-mix vs bags

$1,048.67

Truck $1,048.67 · 80 lb bags $1,930.50

Slab footprint and rebar gridLive scaled blueprint
8.00 ft30.00 ft#4 / 12 mm at 18 in OC · 6 in slab

Grid lines are equalized so the drawing stays readable. The order count uses on-center spacing with a bar at each end of the layout, then holds concrete cover in the field.

Bill of materials and shopping list
ItemNetWasteOrderUnit priceLine totalSource Spec Material / Tool
Ready-mix concrete5.78 yd³10%6.36 yd³ / 4.859 m³USD$1,048.67Source Spec Material / Tool
Short-load feeFull load—1 truck @ 10 yd³USD$0.00Source Spec Material / Tool
80 lb pre-mix bags260.0 bags10%286 bagsUSD$1,930.50Source Spec Material / Tool
60 lb pre-mix bags346.7 bags10%382 bagsUSD$2,062.80Source Spec Material / Tool
#4 rebar sticks, 20 ft41 sticks10%46 sticks / 41 × 6 mUSD$644.00Source Spec Material / Tool
Rebar chairs126 crossings10%139 chairsUSD$38.92Source Spec Material / Tool
Tie wire rolls126 ties10%1 rollsUSD$8.00Source Spec Material / Tool

Source links open a product search on the Amazon storefront for the selected currency. SiteSpecCalc may earn a commission. The link does not change the quantities above.

Ready-mix truck

$1,048.67

0.64 nominal 10 yd³ loads · 1 to order

80 lb bags

$1,930.50

60 lb alternative $2,062.80 · delivery weight 25,740 lb

Side-by-side thickness comparison at the same footprint
ThicknessOrder yd³Order m³80 lb bagsRebar ftReady-mix80 lb cost
4 in5.213.987235550$860.44$1,586.25
5 in5.794.423261550$954.56$1,761.75
6 in6.364.859286550$1,048.67$1,930.50
Show the deterministic formula

Slab ft³ = L × W × thickness ÷ 12. Thickened-edge extra = footing band × (footing depth − slab thickness), with corner squares counted once.

yd³ = ft³ ÷ 27. m³ = ft³ × 0.0283168. Weight uses 150 lb/ft³, then the header converts that pound total at 1 lb = 0.45359237 kg. 80 lb bags yield 0.6 ft³ and 60 lb bags yield 0.45 ft³. Currency changes the price labels only.

Bars across a span = floor(span ÷ spacing) + 1. Order sticks = that count, plus 10, 5, or 15 percent waste, cut from 20 ft and 6 m stock. Chairs = one per grid intersection.

Engineering notes

When designing a residential slab, it is crucial to consider the dimensions and reinforcement requirements. For a slab measuring 8 ft by 30 ft with a thickness of 6 inches, #4 rebar should be placed at 18-inch intervals to provide adequate support and structural integrity.

Note that soil design considerations are excluded from this calculation. Always consult a qualified engineer for specific site conditions and soil bearing capacity.

Code reference

IRC R506

Field questions

What is the purpose of using #4 bars in the slab?
Using #4 bars helps to reinforce the concrete slab, providing additional tensile strength and preventing cracking.
Is soil design included in this slab calculation?
No, soil design considerations are excluded. It is recommended to consult a qualified engineer for soil analysis.
What does IRC R506 cover?
IRC R506 provides guidelines for the design and construction of concrete slabs, including reinforcement and thickness requirements.

Explore Related Engineering Calculations