24×30 Monolithic Shop Slab with Rebar

A 24 by 30 ft monolithic shop slab with a thickened edge and a 16 in rebar grid.

Formula SSC-2026.1

Formula SSC-2026.1 · 4,000 PSI

Order volume

16.79 yd³

12.833 m³ placed+waste

Order weight

67,980 lb

30,835 kg

80 lb bags

756

18 pallets at 42 bags

60 lb bags

1,008

0.45 ft³ yield each

Rebar

1,338.00 ft

96 × 20 ft · 96 × 6 m · 983 lb

Ready-mix vs bags

$2,769.56

Truck $2,769.56 · 80 lb bags $5,103.00

Slab footprint and rebar gridLive scaled blueprint
30.00 ft24.00 ft#4 / 12 mm at 16 in OC · 6 in slab

Grid lines are equalized so the drawing stays readable. The order count uses on-center spacing with a bar at each end of the layout, then holds concrete cover in the field.

Bill of materials and shopping list
ItemNetWasteOrderUnit priceLine total
Ready-mix concrete15.26 yd³10%16.79 yd³ / 12.833 m³USD$2,769.56
Short-load feeFull load—2 truck @ 10 yd³USD$0.00
80 lb pre-mix bags686.7 bags10%756 bagsUSD$5,103.00
60 lb pre-mix bags915.6 bags10%1,008 bagsUSD$5,443.20
#4 rebar sticks, 20 ft96 sticks10%106 sticks / 96 × 6 mUSD$1,484.00
Rebar chairs437 crossings10%481 chairsUSD$134.68
Tie wire rolls437 ties10%2 rollsUSD$16.00

Ready-mix truck

$2,769.56

1.68 nominal 10 yd³ loads · 2 to order

80 lb bags

$5,103.00

60 lb alternative $5,443.20 · delivery weight 67,980 lb

Side-by-side thickness comparison at the same footprint
ThicknessOrder yd³Order m³80 lb bagsRebar ftReady-mix80 lb cost
5 in14.6911.2346621,472$2,424.48$4,468.50
6 in16.7912.8337561,472$2,769.56$5,103.00
8 in20.9716.0319441,472$3,459.70$6,372.00
Show the deterministic formula

Slab ft³ = L × W × thickness ÷ 12. Thickened-edge extra = footing band × (footing depth − slab thickness), with corner squares counted once.

yd³ = ft³ ÷ 27. m³ = ft³ × 0.0283168. Weight uses 150 lb/ft³, then the header converts that pound total at 1 lb = 0.45359237 kg. 80 lb bags yield 0.6 ft³ and 60 lb bags yield 0.45 ft³. Currency changes the price labels only.

Bars across a span = floor(span ÷ spacing) + 1. Order sticks = that count, plus 10, 5, or 15 percent waste, cut from 20 ft and 6 m stock. Chairs = one per grid intersection.

Engineering notes

The slab is 6 in thick and the edge is modeled as 12 in wide by 12 in deep. Only the concrete below the slab thickness is added, and the four corner squares are counted once. Two continuous #4 bars are added around the perimeter for the turn-down. The mat is #4 at 16 in on center. Order yards include 10 percent waste. This does not size the footing for soil bearing or frost depth.

Code reference

IRC R506.1 sets a 3.5 in minimum for concrete slab-on-ground floors. Reinforcement cover and spacing follow ACI 318 practice and the local inspector. This quantity takeoff is not a soils or structural design.

Field questions

What does monolithic mean on this page?
The slab and the thickened edge are placed in one pour. The extra volume is the edge depth below the 6 in slab, not a second full-depth rectangle.
Why are there extra rebar bars when the edge is on?
The grid covers the mat. The turn-down adds two continuous bars around the perimeter, then cuts them from 20 ft and 6 m stock.
How many 10 yard trucks does 24 by 30 take?
Divide the order yards by 10. The result card shows both the decimal loads and the whole trucks to schedule.